Your own solar system

Which areas are suitable for system size of over 50 kWp?

  • Flat roofs over 1000m²
  • Slanting roofs with a total surface of over 1000m² (N+S)
  • Ground surfaces over 1000m²

What information do we need?

  • Correct address with post code
  • Roof size
  • Roof material (concrete, steel, wood, …)
  • Type and age of roof covering
  • Location and capacity of grid connection (in kVa)
  • Copy of electricity invoice and annual consumer profile

What is the procedure?

  1. Initial technical screening
  2. Proposal with yield simulation
  3. Frame agreement or statement of intent
  4. Project development. Technical phase (2 months)
    • Examination of connection possibilities
    • Examination of stability (roof only)
    • Integrity of roof
    • Planning permission
  5. Final construction plan
  6. Agreement and if applicable advance payment
  7. Preparation construction project (1 month)
  8. Construction, inspection and grid connection (1 MWp per month)

Total lead time: about 5 months

What are your benefits?

  • Direct saving on energy
  • Reducing on going energy costs
  • Foreseeable long-term profit/savings
  • Reduce your  carbon footprint. CO²-neutral management strategy
  • Additional roof protection.
  • An innovative company image appreciated by employees, customers and suppliers